ISACA COBIT 5 – Measure (BOK V) Part 6
16. Gage R&R – Range Method (BOK V.C.1) So starting with the range method of gauge R and R study, we have already talked about this, that this provides a quick estimate of GRR, gauge, repeatability and reproducibility. And the problem here is this doesn’t split the variation into two pieces. This just gives you… Read More »
ISACA COBIT 5 – Measure (BOK V) Part 5
11. Measurement System Analysis – Introduction (BOK V.C.1) We use DMAC approach, d for define, m for measure, a for analyze, I for improve and C for control. So once we are in measurement phase, which is the second phase where you want to evaluate how things are moving, how your processes are performing, for… Read More »
ISACA COBIT 5 – Measure (BOK V) Part 4
7. Sampling (BOK V.B.3) Hey, welcome to this topic of sampling. Before we talk about sampling, let’s understand population. What is population? Population is the entire collection which we want to study. And this entire collection depends on what you want to study. So for example, if you want to study the height of grade… Read More »
ISACA COBIT 5 – Measure (BOK V) Part 3
5. Types of Data (BOK V.B.1) In measurement phase of DMAC, which is M in DMAC. We are concerned about collecting data and when we are collecting data, we need to understand what are the types of data we have. Because if we know the type of data, we can use appropriate tool, we can… Read More »
ISACA COBIT 5 – Measure (BOK V) Part 2
3. Process Analysis Tools – Part 1 (BOK V.A.2) In measurement phase of the project. When we want to measure the performance of processes, we need to understand processes, what all is happening and for that we use process analysis tools. So here I have listed some of the tools which we could use when… Read More »
ISACA COBIT 5 – Measure (BOK V)
1. Introduction – Section 5 Completing the define phase of the project which was the first phase of DMAC process D four Define. Now we come to M which is the major phase of the project. In defined phase you have set up the business case for the project. You have a charter, you have… Read More »
ISACA COBIT 5 – Define (BOK IV) Part 9
23. Analytical Tools – Activity Network Diagrams (BOK IV.D.5) So coming to the next tool here, which is activity network diagram. Activity network diagram is used to manage a number of tasks in sequence. So if you have a number of things to do, number of tasks to do which are in sequence, then you… Read More »
ISACA COBIT 5 – Define (BOK IV) Part 8
20. Analytical Tools – Tree Diagrams (BOK IV.D.2) So after talking about affinity diagram, let’s talk about the second tool and which is tree diagram. So tree diagram is to break down a goal or a broad category into fine levels of detail and fine level of details that contributes to that issue. If this… Read More »
ISACA COBIT 5 – Define (BOK IV) Part 7
17. Project Managament Tools – WBS (BOK IV.C.3) So after talking about the Gantt chart, the toll gate reviews, now let’s talk about the third tool here. The third tool here is WBS or work breakdown structure. Work breakdown structure is a very common tool when you are doing a big project. A big project,… Read More »
ISACA COBIT 5 – Define (BOK IV) Part 6
14. Project Charter Review (BOK IV.B.6) So in our discussion on project charter, we have talked about business case, we have talked about problem statement, scope, goals and objectives and performance measures. In this video, let’s look at three left out elements which are charter review, plan and team member commitment. So here we have… Read More »