Get 100% Real Exam Questions, Accurate & Verified Answers By IT Experts
Fast Updates & Instant Download!
Download Free 70-401 Exam Questions
Exam | 70-401 - Microsoft System Center Configuration Manager 2007, Configuring |
Size: | 460.64 KB |
Posted Date: | Wednesday, June 29, 2011 |
# of downloads: | 3 |
Free Download: | This file is outdated. Browse other 70-401 VCE Files |
Top Microsoft Certification Exams
Site Search:
Only Registered Members Can Download VCE Files or View Training Courses
Please fill out your email address below in order to Download VCE files or view Training Courses. Registration is Free and Easy - you simply need to provide an email address.
Log into your ExamCollection Account
Please Log In to download VCE file or view Training Course
Only registered Examcollection.com members can download vce files or view training courses.
SPECIAL OFFER: GET 10% OFF
Pass your Exam with ExamCollection's PREMIUM files!
SPECIAL OFFER: GET 10% OFF
Use Discount Code:
MIN10OFF
A confirmation link was sent to your e-mail.
Please check your mailbox for a message from support@examcollection.com and follow the directions.
Download Free Demo of VCE Exam Simulator
Experience Avanset VCE Exam Simulator for yourself.
Simply submit your e-mail address below to get started with our interactive software demo of your free trial.
@fladnag, B is possible because Hardware Inventory collects Add/Remove programs information which you can use to build a Query membership rule for Coll1.
Default HWinv cycle is 7 days, increasing the frequency will provide you with updated information to Query.
For the below question this dump has A for the answer in one exam and B in another exam. I figure it must be A. But this dump and most others show B.
I dont see how B is possible.
You have a System Center Configuration Manager 2007 environment. You deploy Microsoft Office 2007 to client computers in a collection named Coll1. You run the Configuration Manager Web report for Add or Remove Programs, and you query for Office 2007. No computers are found to have Office 2007 installed. You need to identify computers that have Office 2007 installed. What should you do?
a: Configure software inventory to run daily.
b: Configure hardware inventory to run daily.
c: Configure Coll1 to update membership daily.
d: Configure Coll1 to have a collection-specific polling interval.
Hi Parag,
Software advertisement should be created to deploy App1 is the correct answer of your question.Have you passed the exam?
What is correct answer for below scenario. Can anyone resolve me?
sorry for spam :(
In Exam E I observed following confusion
You are going to deploy Microsoft Windows vista. You have a configuration manager package that installs an application named App1. App1 can installed only by using interactive logged-on users rights. When you create sequence, you find that App1 doesn't appear as available package to deploy. You should e able to install App1. What action should you perform?
A software advertisement should be created to deploy App1.
B software update advertisement should be created to deploy App1.
C Acustom task sequence step should be added to connect to a network share, & a command line should be run to install App1
D The App1 program should be configured to run with administrative rights,and allow users to interact with the program
Answers in this dump is : Software advertisement should be created to deploy App1.
&
Another dums tell me the answer is
Configure the App1 program to run with administrative rights,and allow users to interact with the program
In Exam E, I observed following confusion
You are going to deploy Microsoft Windows vista. You have a configuration manager package that installs an
application named App1. App1 can installed only by using interactive logged-on users rights. When you
create sequence, you find that App1 doesn't appear as available package to deploy. You should e able to
install App1. What action should you perform?
A software advertisement should be created to deploy App1.
B software update advertisement should be created to deploy App1.
C Acustom task sequence step should be added to connect to a network share, & a command line should be run
to install App1
D The App1 program should be configured to run with administrative rights,and allow users to interact
with the program
Answers in this dump is : Software advertisement should be created to deploy App1.
&
Another dums tell me
Configure the App1 program to run with administrative rights,and allow users to interact with the program
Guys,
16/08/2011 failed with 680 marks.
Not valid in İstanbul. Score 616.
Most of new Qs.
Most of the Questions in SyedFarazRehman Dump are included in the Sree Dump. If i read only the Sree dump will i be able to pass this exam? People who passed this exam which dumps have they used?
@ Dreamworker, which dumps did you use?
passed this one:
NL, 2,5h time, 56 questions (about 12 new ones).
This exam is not that difficult. If you have handson experience you probably pass right away. If you don't have handson experience -> build a sccm test site so you can practice. It will certainly help you. There are some duplicatie questions in this dump BTW.
almost half of the questions are twice and some of the answers are not correct!
but better than nothing . thanks!
Hi all,
Any one tries http://www.itexamworld.net/70-401.htm ?
If yes, do you advice?
Yesterday I fail(India) .Nearly 21 new questions.30 questions from dump. Please refer a lot. If anybody having latest dump please share me. gokularvind05@gmail.com
You have a System Center Configuration Manager 2007 environment. You have a secondary site at a
branch office. The branch office is connected to the main office by a 512-Kbps (kilobits per second) WAN
link.
You need to eliminate all package distribution traffic on the WAN from the primary site between 3:00 P.M.
and 5:00 P.M.
Which two tasks should you do on the sender address(Each correct answer presents part of the solution.
Choose two.)
A. Configure rate limits for the primary site.
B. Configure pulse mode for the primary site.
C. Configure pulse mode for the secondary site.
D. Configure a schedule for the primary site.
Answer: AD
From http://technet.microsoft.com/en-us/library/bb632857.aspx
You can also limit the amount of data sent between sites to a fine level of precision. This allows you to specify the size of the data blocks that are sent, and also to specify a time delay between sending each data block. This is called pulse mode. Pulse mode can be configured in the properties of an address on the Rate Limits tab, and it is useful when you have a very low network bandwidth available between sites. For example, you might have constraints to send 1 KB of data every five seconds, but not 1 KB every three seconds, regardless of the speed of the link or its usage at a given time.
So any answer of Pulse Mode doesn't make sense for this question, as it is not a schedule based (between the hours of).
Nick what is the answer to the new question?
new question:
you deploying critical application appl1 in environment with Wake on LAN enable it is 6 pm and you must get appl1 deployed in with 12 hours what should you do.
a. advertise with start 6 pm and end 6am select enable wake on LAN
b. advertise appl1 as soon as possible select enable wake on LAN
c I cannot remember the rest thet did not make sense
Is it both A&B or just one of them
passed, too.
about 20 new of the 56 questions.
u should definitely work with the product before you take the exam.
Passed with 746 Points
56 questions. Around 60% of the question are from this dump. The 2 questions Nick from the Uk posted are in it asswell.
Hi Guys,
Which is the latest dump valid in SA?
This download is corrupted and will not load in Visual CertExam Manager 1.9.1025
And in uk this question requires two answers , A and D ????
You have a System Center Configuration Manager 2007 environment.
You have a secondary site at a branch office. The branch office is connected to the main office by a 512-Kbps (Kilobits per second) WAN link.
You need to eliminate all package distribution traffic on the WAN from the primary site between 3:00 P.M and 5:00 P.M.
What should you do on the sender address?
A. Configure rate limits for the primary site.
B. Configure pulse mode for the primary site.
C. Configure pulse mode for the secondary site.
D. Configure a schedule for the primary site.
Was there any more help on this question ?
new question:
you deploying critical application appl1 in environment with Wake on LAN enable it is 6 pm and you must get appl1 deployed in with 12 hours what should you do.
a. advertise with start 6 pm and end 6am select enable wake on LAN
b. advertise appl1 as soon as possible select enable wake on LAN
c I cannot remember the rest thet did not make sense
This dump is 85% valid. You need to have production expereince to handle couple of tricky questions. The answers would be twisted format and willnot be in the same sequence as in dumps. Get the concepts right and you will be able to clear this certification.
Cheers..Guru
Hello Guys, 56 Q/A, i'm try in:
Date:
15/July - Score: 683
22/July - Score: 683 !!!!!
12/18 - New Questions
i believe that this dump is not valid anymore =/
Hello Guys, 56 Q/A, i'm try in:
15/07 - Score: 683
22/07 - Score: 683 !!!!!
12/18 - New Questions
i believe that this dump is not valid anymore =/
is question 33 correct, aren't you just changing (migrating or moving) to a new parent site.. why not add the new parent ip then change the site properties to report to new parent instead of doing an uninstall/reinstall??
Hello peeps,
I am glad to announce that I just passed this exam today. My advice? you need to do a lot personal work to scale this exam.
I practiced this dump and 70-401v2011-06-13by Sree. Though I practised the over 350 questions in both dumps combined, i did NOT get a 900 score. So I can say some answers in the dump are not correct.
I learnt and practiced SCCM personally too (though I am not yet an expert in it), so i believed that helped me with the almost 20 new questions i faced in the real exam.
So use the dumps, verify the answers if you can, and try to at least understand the basic concept around SCCM. it would help a lot. Some of the questions are just tricky and not difficult so always review all answers.
All the best peeps
http://www.dump4certs.com/70-401.html
85 QA updated 11th July 2011
any one have it?
Passed on 08/07/2011 in GER. 56 Qs, about 15-20 new Qs. Answers are shuffled and few are rewritten, and some Answers in the dumps are wrong. Good luck guys
Hi, this Dump is ~75% valid, can anyone add the new questions? manyy thanxx
Passed with 764. This dump is 85% valid. thanks faraz. u r 2 good buddy.
Passed in Russia 30/06/2011. Valid about 40%. Many new questions.
passed this exam with 721. This dumps are 100% valid but options sequence are change. Thanks Faraz Rehman!
Thanx Faraz.
This is valid dump but some questions are change, and your Result statment 85% must be acceptable.
Yes Dude ! its Working I got cleared by using this dump but some question are changed.
Thank u faraz.. this is valid..
Hello guys, I have passed the exam very efficiently from some collections of SCCM exams, here i have consolidate all the required stuff.
All answers are correct but in exams some questions have same scenarios but different site and server names. So dont practice blindly go through from all questions then review the answer.
Result will be 85% surely.